Move a job to another day

Drag a job to a new day on the calendar.

How to do it

What this is for: rescheduling a job by dragging it to a new day or time on the Schedule.

Steps

  1. Click Schedule, then Week (top left). Use ‹ and › to get to the right week; 7d shows weekends too.
  2. Press and hold on the job block you want to move (e.g. Toolbox Red Wrinkle · Pioneer Auto… on Monday at 7 AM).
  3. Drag it to the new day and time and let go (e.g. Thursday at 9 AM).
  4. The job appears in its new slot straight away, and the job counts at the top of each day change (Mon 3 jobs → 2 jobs, Thu 3 jobs → 4 jobs).
  5. To schedule a job that has no date yet, drag it from the Unscheduled list on the right onto the calendar.

Good to know

  • No confirmation box appears; the move saves as soon as you let go.
  • Moving a job on the Schedule is the same as using Schedule on the job card, which also sets the job's due date (see "Quick actions on a job card").
  • Day view works the same way for moving a job to a different time on the same day.

If something looks wrong

  • Dropped on the wrong slot: drag it again to the right one.
  • The job snapped back: let go inside a day column, not on the time labels or the Unscheduled panel.

Transcript

  1. On the Schedule, switch to Week view.
  2. Press and hold on the job you want to move.
  3. Drag it to the new day and time, and let go.
  4. Done. The job's in its new slot, and the day counts update.
  5. You can also drag jobs from the Unscheduled list onto the calendar.

See it on a real shop floor

Open the demo shop — no signup, nothing to install — or start a free trial with your own jobs.