Move a job to another day
Drag a job to a new day on the calendar.
How to do it
What this is for: rescheduling a job by dragging it to a new day or time on the Schedule.
Steps
- Click Schedule, then Week (top left). Use ‹ and › to get to the right week; 7d shows weekends too.
- Press and hold on the job block you want to move (e.g. Toolbox Red Wrinkle · Pioneer Auto… on Monday at 7 AM).
- Drag it to the new day and time and let go (e.g. Thursday at 9 AM).
- The job appears in its new slot straight away, and the job counts at the top of each day change (Mon 3 jobs → 2 jobs, Thu 3 jobs → 4 jobs).
- To schedule a job that has no date yet, drag it from the Unscheduled list on the right onto the calendar.
Good to know
- No confirmation box appears; the move saves as soon as you let go.
- Moving a job on the Schedule is the same as using Schedule on the job card, which also sets the job's due date (see "Quick actions on a job card").
- Day view works the same way for moving a job to a different time on the same day.
If something looks wrong
- Dropped on the wrong slot: drag it again to the right one.
- The job snapped back: let go inside a day column, not on the time labels or the Unscheduled panel.
Transcript
- On the Schedule, switch to Week view.
- Press and hold on the job you want to move.
- Drag it to the new day and time, and let go.
- Done. The job's in its new slot, and the day counts update.
- You can also drag jobs from the Unscheduled list onto the calendar.